[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-825680":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},825680,519,2,"多选题","（2018年真题）运用重置成本法评估房屋建筑物时，下列费用项目中，属于前期费用及其他费用的有（ ）。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","土地开发费",false,{"key":16,"text":17,"correct":18},"B","临时设施费",true,{"key":20,"text":21,"correct":18},"C","地质勘察费",{"key":23,"text":24,"correct":14},"D","文明施工费",{"key":26,"text":27,"correct":18},"E","建筑单位管理费","BCE","前期费用及其他费用的确定。除建筑安装工程造价外，一般建安工程还有其他有关费用，包括前期费用、期间费用等。前期费用包括筹建费、可行性研究费、规划费、设计费、地质勘察费、场地平整费、水电气费、临时设施费用等。期间费用主要为工程建设监理费、建设单位管理费、城市基础设施配套费、人防工程易地建设费、文物调查、勘探、发掘费、拆迁管理费、新型墙体材料专项基金、建筑垃圾处置费、临时占道费和其他相关验收检测费等。",{"id":6,"name":31,"category":32,"favorite":33},"资产评估实务一","会计财税",0]