[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-825090":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},825090,519,1,"单选题","被评估企业有某种零件的在产品1000件，完工程度并不完全相同，如果按已完工工时与该种零件全部工序所需工时的比例进行分类，1000件在产品中有400件已完成40%，有600件已完成60%。已知评估基准日该种零件的产成品成本为每件200元，其中材料费占60%，人工及其他费用占40%，假设各工序每个工时的人工及其他费用相同，不考虑其他因素，这批在产品的评估值最接近于（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","104000元",true,{"key":16,"text":17,"correct":18},"B","143200元",false,{"key":20,"text":21,"correct":18},"C","161600元",{"key":23,"text":24,"correct":18},"D","183500元","评估值＝400×200×40%＋600×200×60%＝104000（元）",{"id":6,"name":27,"category":28,"favorite":29},"资产评估实务一","会计财税",0]