[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-824992":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},824992,518,1,"单选题","下列关于资产评估计划调整、审核及批准的说法，错误的是()。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","资产评估机构通常会通过内部控制制度和流程对资产评估计划的编制、审核、批准及调整进行规范",false,{"key":16,"text":17,"correct":18},"B","由于前期资料搜集不齐全，工作推进后发现需要进一步补充资料和增加现场工作时间，从而造成未能按计划完成进度，这属于技术层面的情况",true,{"key":20,"text":21,"correct":14},"C","调整计划要兼顾评估效率和工作质量的原则，充分利用已有的工作成果，将评估计划调整导致的成本降低到最低水平",{"key":23,"text":24,"correct":14},"D","调整计划时，往往涉及对评估专业人员进行调整、对部分评估工作做出重新安排，对评估技术方案进行修正等","由于前期资料搜集不齐全，工作推进后发现需要进一步补充资料和增加现场工作时间，从而造成未能按计划完成进度，这属于操作层面的情况。",{"id":6,"name":27,"category":28,"favorite":29},"资产评估基础","会计财税",0]