[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-824991":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},824991,518,2,"多选题","以下情形中会导致评估专业人员需要对资产评估计划做出调整的有()。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","前期资料收集不全，获取补充资料后，仍能按照原定计划完成评估工作进度",false,{"key":16,"text":17,"correct":18},"B","出现了未预料到的资产类型，原计划评估技术思路无法满足需要",true,{"key":20,"text":21,"correct":18},"C","被评估单位发生资产重组，新增部分标的公司",{"key":23,"text":24,"correct":18},"D","委托人出现状况，需要改变评估基准日",{"key":26,"text":27,"correct":18},"E","现场调查受限导致不能按原定计划完成评估工作","BCDE","A选项获取补充资料不会影响原定计划工作进度，因此不需要对计划进行调整jBE选项属于由于评估工作本身遇到障碍需要调整评估计划的情形jCD选项属于由于委托人经济行为涉及的评估对象、评估范围、评估基准日发生变化导致需要调整评估计划的情形。",{"id":6,"name":31,"category":32,"favorite":33},"资产评估基础","会计财税",0]