[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-824978":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},824978,518,2,"多选题","以下选项中，()是评估项目进入实施阶段前需要做的工作。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","收集整理评估资料",false,{"key":16,"text":17,"correct":18},"B","签订业务委托合同",true,{"key":20,"text":21,"correct":14},"C","进行评估现场调查",{"key":23,"text":24,"correct":18},"D","明确业务基本事项",{"key":26,"text":27,"correct":18},"E","编制资产评估计划","BDE","项目进入实施阶段前，即项目的承接、组织阶段，需要做的工作包括:明确业务基本事项、签订业务委托合同、编制资产评估计划。",{"id":6,"name":31,"category":32,"favorite":33},"资产评估基础","会计财税",0]