[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-823010":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},823010,518,1,"单选题","按照审核人员与项目团队的关系，审核分为（ ）。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","非现场审核及现场审核",false,{"key":16,"text":17,"correct":14},"B","独立审核及非独立审核",{"key":19,"text":20,"correct":21},"C","项目团队内部的审核及项目团队之外的独立审核",true,{"key":23,"text":24,"correct":14},"D","复杂审核及简单审核","按照审核人员是否到达现场，审核分为非现场审核及现场审核。按照审核人员与项目团队的关系，审核又分为项目团队内部的审核及项目团队之外的独立审核。选项BD为迷惑项，本教材无此分类。",{"id":6,"name":27,"category":28,"favorite":29},"资产评估基础","会计财税",0]