[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-814817":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},814817,515,1,"单选题","下列有关计划和安排生产业务所实施的控制中，说法错误的是（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","生产计划部门决定生产授权",false,{"key":16,"text":17,"correct":18},"B","生产通知单预先连续编号的意义并不明显",true,{"key":20,"text":21,"correct":14},"C","生产计划部门需要编制材料需求报告，列示需要的材料及其库存",{"key":23,"text":24,"correct":14},"D","生产工人在完成生产任务后，将完成的产品交生产部门清点，然后转交检验员验收并办理入库手续","决定授权生产，即签发预先顺序编号的生产通知单。生产计划部门应将发出的所有生产通知单顺序编号并加以记录控制。",{"id":6,"name":27,"category":28,"favorite":29},"注册会计师-审计","会计财税",0]