[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-805767":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},805767,512,1,"单选题","（2017年）下列各项中，对准时生产方法（JIT）的作用表述错误的是（）。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","该方法降低了存货变质、陈旧或过时的可能性",false,{"key":16,"text":17,"correct":14},"B","该方法可能导致生产环节一旦出错则弥补空间小",{"key":19,"text":20,"correct":21},"C","该方法能够减少对供应商的依赖",true,{"key":23,"text":24,"correct":14},"D","该方法避免了因需求突然变动而导致大量产品无法出售的情况","本题考核JIT的知识点。JIT的缺点之一是生产对供应商的依赖性较强，故选项C错误。",{"id":6,"name":27,"category":28,"favorite":29},"注册会计师-公司战略与风险管理","会计财税",0]