[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-805262":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},805262,512,1,"单选题","（2017年）通达路桥公司拟在某省建一座大桥，此工程面临许多不确定因素，如工程总投资、银行贷款、过桥费收入等，公司为预测其效益，防范其风险，组织相关人员分析了上述每一个因素的变化对该项目的内部收益率的影响，此公司采取的风险管理方法是（ ）。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","情景分析法",false,{"key":16,"text":17,"correct":14},"B","风险评估分析法",{"key":19,"text":20,"correct":21},"C","敏感性分析法",true,{"key":23,"text":24,"correct":14},"D","马尔科夫分析法","敏感性分析是针对潜在的风险性，研究项目的各种不确定因素变化至一定幅度时，计算其主要经济指标变化率及敏感程度的一种方法。",{"id":6,"name":27,"category":28,"favorite":29},"注册会计师-公司战略与风险管理","会计财税",0]