[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-511-9":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":612},{"id":5,"name":6,"category":7,"favorite":8},511,"注册会计师-财务成本管理","会计财税",0,9,50,1632,[13,34,49,61,74,86,99,111,123,131,139,151,162,175,187,197,210,222,234,246,258,270,282,295,307,319,331,343,356,368,380,392,404,416,428,441,453,461,470,482,494,505,517,529,541,554,566,577,589,600],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":20,"analysis":33},804385,1,"单选题","（2018年）使用三因素法分析固定制造费用差异时，固定制造费用闲置能量差异是（ ）。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","实际工时偏离生产能量而形成的差异",true,{"key":24,"text":25,"correct":26},"B","实际费用与预算费用之间的差异",false,{"key":28,"text":29,"correct":26},"C","实际工时脱离实际产量标准工时形成的差异",{"key":31,"text":32,"correct":26},"D","实际产量标准工时偏离生产能量形成的差异","",{"id":35,"libraryId":5,"type":36,"typeLabel":37,"stem":38,"options":39,"answer":48,"analysis":33},804388,2,"多选题","（2016年）下列各项中，需要修订产品基本标准成本的有（ ）。",[40,42,44,46],{"key":20,"text":41,"correct":26},"产品生产能力利用程度显著提升",{"key":24,"text":43,"correct":26},"生产工人技术操作水平明显改进",{"key":28,"text":45,"correct":22},"产品主要材料价格发生重要变化",{"key":31,"text":47,"correct":22},"产品物理结构设计出现重大改变","CD",{"id":50,"libraryId":5,"type":15,"typeLabel":16,"stem":51,"options":52,"answer":31,"analysis":33},804392,"（2014年）甲公司是一家模具制造企业，正在制定某模具的标准成本。加工一件该模具需要的必不可少的加工操作时间为90小时，设备调整时间为1小时，必要的工间休息为5小时。正常的废品率为4%。该模具的直接人工标准工时是（ ）小时。",[53,55,57,59],{"key":20,"text":54,"correct":26},"93.6",{"key":24,"text":56,"correct":26},"96",{"key":28,"text":58,"correct":26},"99.84",{"key":31,"text":60,"correct":22},"100",{"id":62,"libraryId":5,"type":36,"typeLabel":37,"stem":63,"options":64,"answer":73,"analysis":33},804397,"（2010年）在进行标准成本差异分析时，通常把变动成本差异分为价格脱离标准造成的价格差异和用量脱离标准造成的数量差异两种类型。下列标准成本差异中，通常应由生产部门负责的有（ ）。",[65,67,69,71],{"key":20,"text":66,"correct":26},"直接材料的价格差异",{"key":24,"text":68,"correct":22},"直接人工的数量差异",{"key":28,"text":70,"correct":22},"变动制造费用的价格差异",{"key":31,"text":72,"correct":22},"变动制造费用的数量差异","BCD",{"id":75,"libraryId":5,"type":15,"typeLabel":16,"stem":76,"options":77,"answer":20,"analysis":33},804403,"（2015年）甲公司本月发生固定制造费用35800元，实际产量2000件，实际工时2400小时。企业生产能量3000小时，每件产品标准工时1小时，固定制造费用标准分配率10元\u002F小时，固定制造费用耗费差异是（ ）。",[78,80,82,84],{"key":20,"text":79,"correct":22},"不利差异5800元",{"key":24,"text":81,"correct":26},"不利差异4000元",{"key":28,"text":83,"correct":26},"不利差异6000元",{"key":31,"text":85,"correct":26},"不利差异10000元",{"id":87,"libraryId":5,"type":36,"typeLabel":37,"stem":88,"options":89,"answer":98,"analysis":33},804407,"（2018年）下列各项情形中，需要对基本标准成本进行修订的有（ ）。",[90,92,94,96],{"key":20,"text":91,"correct":22},"产品的物理结构发生变化",{"key":24,"text":93,"correct":22},"重要原材料价格发生重大变化",{"key":28,"text":95,"correct":22},"生产技术和工艺发生根本变化",{"key":31,"text":97,"correct":26},"市场供求变化导致售价发生变化","ABC",{"id":100,"libraryId":5,"type":15,"typeLabel":16,"stem":101,"options":102,"answer":28,"analysis":33},804411,"（2010年）下列关于制定正常标准成本的表述中，正确的是（ ）。",[103,105,107,109],{"key":20,"text":104,"correct":26},"直接材料的价格标准不包括购进材料发生的检验成本",{"key":24,"text":106,"correct":26},"直接人工标准工时包括直接加工操作必不可少的时间，不包括各种原因引起的停工工时",{"key":28,"text":108,"correct":22},"直接人工的价格标准是指标准工资率，它可以是预定的工资率，也可以是正常的工资率",{"key":31,"text":110,"correct":26},"固定制造费用和变动制造费用的用量标准可以相同，也可以不同。例如，以直接人工工时作为变动制造费用的用量标准，同时以机器工时作为固定制造费用的用量标准",{"id":112,"libraryId":5,"type":15,"typeLabel":16,"stem":113,"options":114,"answer":24,"analysis":33},804417,"甲公司5月份生产产品400件，实际使用工时890小时，支付工资4539元；直接人工的标准成本是10元\u002F件，每件产品标准工时为2小时，则工资率差异为（）元。",[115,117,119,121],{"key":20,"text":116,"correct":26},"450",{"key":24,"text":118,"correct":22},"89",{"key":28,"text":120,"correct":26},"539",{"key":31,"text":122,"correct":26},"268",{"id":124,"libraryId":5,"type":15,"typeLabel":16,"stem":125,"options":126,"answer":31,"analysis":33},804423,"甲公司是一家模具制造企业，正在制定某模具的标准成本。加工一件该模具需要的必不可少的加工操作时间为90小时，设备调整时间为1小时，必要的工间休息为5小时。正常的废品率为4%。该模具的直接人工标准工时是（）小时。",[127,128,129,130],{"key":20,"text":54,"correct":26},{"key":24,"text":56,"correct":26},{"key":28,"text":58,"correct":26},{"key":31,"text":60,"correct":22},{"id":132,"libraryId":5,"type":36,"typeLabel":37,"stem":133,"options":134,"answer":73,"analysis":33},804440,"在进行标准成本差异分析时，通常把变动成本差异分为价格脱离标准造成的价格差异和用量脱离标准造成的数量差异两种类型。下列标准成本差异中，通常应由生产部门负责的有（ ）。",[135,136,137,138],{"key":20,"text":66,"correct":26},{"key":24,"text":68,"correct":22},{"key":28,"text":70,"correct":22},{"key":31,"text":72,"correct":22},{"id":140,"libraryId":5,"type":15,"typeLabel":16,"stem":141,"options":142,"answer":24,"analysis":33},804449,"企业进行固定制造费用差异分析时可以使用三因素分析法。下列关于三因素分析法的说法中，正确的是（ ）。",[143,145,147,149],{"key":20,"text":144,"correct":26},"耗费差异=固定制造费用实际成本-固定制造费用标准成本",{"key":24,"text":146,"correct":22},"闲置能量差异=（生产能量-实际工时）×标准分配率",{"key":28,"text":148,"correct":26},"效率差异=（实际工时-预算产量标准工时）×标准分配率",{"key":31,"text":150,"correct":26},"三因素分析法中的闲置能量差异与二因素分析法中的能量差异相同",{"id":152,"libraryId":5,"type":15,"typeLabel":16,"stem":153,"options":154,"answer":20,"analysis":33},804450,"某公司生产单一产品，实行标准成本管理。每件产品的标准工时为3小时，固定制造费用的标准成本为6元，企业生产能量为每月生产产品400件。7月份公司实际生产产品350件，发生固定制造成本2250元，实际工时为1100小时。根据上述数据计算，7月份公司固定制造费用效率差异为（ ）元。",[155,156,158,160],{"key":20,"text":60,"correct":22},{"key":24,"text":157,"correct":26},"150",{"key":28,"text":159,"correct":26},"200",{"key":31,"text":161,"correct":26},"300",{"id":163,"libraryId":5,"type":36,"typeLabel":37,"stem":164,"options":165,"answer":174,"analysis":33},804451,"甲公司制定产品标准成本时采用现行标准成本。下列情况中，需要修订现行标准成本的有（ ）。",[166,168,170,172],{"key":20,"text":167,"correct":22},"季节原因导致材料价格上升",{"key":24,"text":169,"correct":22},"订单增加导致设备利用率提高",{"key":28,"text":171,"correct":22},"采用新工艺导致生产效率提高",{"key":31,"text":173,"correct":22},"工资调整导致人工成本上升","ABCD",{"id":176,"libraryId":5,"type":15,"typeLabel":16,"stem":177,"options":178,"answer":28,"analysis":33},804452,"在下列标准成本中，可以作为评价实际成本依据的是（ ）。",[179,181,183,185],{"key":20,"text":180,"correct":26},"理想标准成本",{"key":24,"text":182,"correct":26},"基本标准成本",{"key":28,"text":184,"correct":22},"现行标准成本",{"key":31,"text":186,"correct":26},"历史平均标准成本",{"id":188,"libraryId":5,"type":15,"typeLabel":16,"stem":189,"options":190,"answer":28,"analysis":33},804453,"甲公司采用标准成本法进行成本控制，某种产品的变动制造费用标准分配率为3元\u002F小时，每件产品的标准工时为2小时，2020年4月，该产品的实际产量为100件，实际工时为250小时，实际发生变动制造费用为1000元，变动制造费用耗费差异为（ ）元。",[191,192,193,195],{"key":20,"text":157,"correct":26},{"key":24,"text":159,"correct":26},{"key":28,"text":194,"correct":22},"250",{"key":31,"text":196,"correct":26},"400",{"id":198,"libraryId":5,"type":36,"typeLabel":37,"stem":199,"options":200,"answer":209,"analysis":33},804454,"下列各项原因中，属于材料价格差异形成原因的有（ ）。",[201,203,205,207],{"key":20,"text":202,"correct":22},"材料运输保险费率提高",{"key":24,"text":204,"correct":22},"运输过程中的损耗增加",{"key":28,"text":206,"correct":26},"加工过程中的损耗增加",{"key":31,"text":208,"correct":26},"储存过程中的损耗增加","AB",{"id":211,"libraryId":5,"type":15,"typeLabel":16,"stem":212,"options":213,"answer":24,"analysis":33},804458,"甲公司是制造业企业，生产A产品，基本生产工人人数为20人，生产工人每月工作25.5天，每天工作8小时，出勤率为98%，生产工人平均总月薪36000元，该产品的理想的作业时间为1.5小时，设备调整时间为0.3小时，工间休息0.1小时，其他必要间歇0.1小时。单位产品直接人工标准成本是（ ）元。",[214,216,218,220],{"key":20,"text":215,"correct":26},"20",{"key":24,"text":217,"correct":22},"18",{"key":28,"text":219,"correct":26},"36",{"key":31,"text":221,"correct":26},"9",{"id":223,"libraryId":5,"type":15,"typeLabel":16,"stem":224,"options":225,"answer":20,"analysis":33},804459,"下列成本差异中，通常不属于生产部门责任的是（ ）。",[226,228,230,232],{"key":20,"text":227,"correct":22},"直接人工工资率差异",{"key":24,"text":229,"correct":26},"直接人工效率差异",{"key":28,"text":231,"correct":26},"直接材料数量差异",{"key":31,"text":233,"correct":26},"变动制造费用效率差异",{"id":235,"libraryId":5,"type":36,"typeLabel":37,"stem":236,"options":237,"answer":174,"analysis":33},804460,"甲公司制定成本标准时采用现行标准成本。下列情况中，需要修订现行标准成本的有（ ）。",[238,240,242,244],{"key":20,"text":239,"correct":22},"主要劳动力的成本大幅度上涨",{"key":24,"text":241,"correct":22},"操作技术改进，单位产品的材料消耗大幅度减少",{"key":28,"text":243,"correct":22},"市场需求增加，机器设备的利用程度大幅度提高",{"key":31,"text":245,"correct":22},"采用了新工艺，导致产品生产效率提高",{"id":247,"libraryId":5,"type":36,"typeLabel":37,"stem":248,"options":249,"answer":209,"analysis":33},804461,"下列各项中属于现行标准成本用途的有（ ）。",[250,252,254,256],{"key":20,"text":251,"correct":22},"可以成为评价实际成本的依据",{"key":24,"text":253,"correct":22},"可以用来对存货和销货成本计价",{"key":28,"text":255,"correct":26},"与各期实际成本对比，可反映成本变动的趋势",{"key":31,"text":257,"correct":26},"揭示实际成本下降的潜力",{"id":259,"libraryId":5,"type":36,"typeLabel":37,"stem":260,"options":261,"answer":98,"analysis":33},804462,"下列各项中，属于直接材料价格正常标准成本包含的项目有（ ）。",[262,264,266,268],{"key":20,"text":263,"correct":22},"发票价格",{"key":24,"text":265,"correct":22},"运费",{"key":28,"text":267,"correct":22},"检验费",{"key":31,"text":269,"correct":26},"非正常损耗",{"id":271,"libraryId":5,"type":36,"typeLabel":37,"stem":272,"options":273,"answer":98,"analysis":33},804463,"原材料质量低劣，可能会造成（ ）向不利方面扩大。",[274,276,278,280],{"key":20,"text":275,"correct":22},"直接材料成本的数量差异",{"key":24,"text":277,"correct":22},"直接人工成本的效率差异",{"key":28,"text":279,"correct":22},"变动制造费用的效率差异",{"key":31,"text":281,"correct":26},"固定制造费用的能量差异",{"id":283,"libraryId":5,"type":36,"typeLabel":37,"stem":284,"options":285,"answer":294,"analysis":33},804464,"下列各项中属于直接材料数量差异形成的原因有（ ）。",[286,288,290,292],{"key":20,"text":287,"correct":22},"工人操作疏忽造成废品或废料增加",{"key":24,"text":289,"correct":26},"奖励制度未产生实效",{"key":28,"text":291,"correct":26},"采购时舍近求远使运费和途耗增加",{"key":31,"text":293,"correct":22},"新工人上岗造成用料增多","AD",{"id":296,"libraryId":5,"type":15,"typeLabel":16,"stem":297,"options":298,"answer":20,"analysis":33},804465,"在确定直接人工正常标准成本时，标准工时不包括（ ）。",[299,301,303,305],{"key":20,"text":300,"correct":22},"设备意外故障产生的停工时间",{"key":24,"text":302,"correct":26},"必要的工间休息",{"key":28,"text":304,"correct":26},"每日例行设备调整时间",{"key":31,"text":306,"correct":26},"不可避免的废品所耗用的工时",{"id":308,"libraryId":5,"type":15,"typeLabel":16,"stem":309,"options":310,"answer":31,"analysis":33},804466,"以下关于变动制造费用效率差异的计算公式中，正确的是（ ）。",[311,313,315,317],{"key":20,"text":312,"correct":26},"变动制造费用实际数-变动制造费用预算数",{"key":24,"text":314,"correct":26},"（实际工时-标准产量标准工时）×变动制造费用标准分配率",{"key":28,"text":316,"correct":26},"（生产能量-实际工时）×变动制造费用标准分配率",{"key":31,"text":318,"correct":22},"（实际工时-实际产量标准工时）×变动制造费用标准分配率",{"id":320,"libraryId":5,"type":15,"typeLabel":16,"stem":321,"options":322,"answer":28,"analysis":33},804467,"某公司只生产销售A产品，A产品本月实际生产800件，实际使用工时1600小时，支付工资8000元；直接人工的标准成本是12元\u002F件，每件产品标准工时3小时。其直接人工工资率差异为（ ）元。",[323,325,327,329],{"key":20,"text":324,"correct":26},"3200",{"key":24,"text":326,"correct":26},"-1600",{"key":28,"text":328,"correct":22},"1600",{"key":31,"text":330,"correct":26},"-3200",{"id":332,"libraryId":5,"type":36,"typeLabel":37,"stem":333,"options":334,"answer":294,"analysis":33},804468,"下列关于固定制造费用成本差异的计算公式中，正确的有（ ）。",[335,337,339,341],{"key":20,"text":336,"correct":22},"固定制造费用耗费差异=固定制造费用实际数-固定制造费用预算数",{"key":24,"text":338,"correct":26},"固定制造费用能量差异=（生产能量-实际工时）×固定制造费用标准分配率",{"key":28,"text":340,"correct":26},"固定制造费用闲置能量差异=固定制造费用预算数-固定制造费用标准成本",{"key":31,"text":342,"correct":22},"固定制造费用效率差异=（实际工时-实际产量标准工时）×固定制造费用标准分配率",{"id":344,"libraryId":5,"type":36,"typeLabel":37,"stem":345,"options":346,"answer":355,"analysis":33},804469,"（2019年）甲公司采用作业成本法，下列选项中，属于生产维持级作业的有（）。",[347,349,351,353],{"key":20,"text":348,"correct":26},"机器加工",{"key":24,"text":350,"correct":22},"行政管理",{"key":28,"text":352,"correct":26},"半成品检验",{"key":31,"text":354,"correct":22},"工厂安保","BD",{"id":357,"libraryId":5,"type":36,"typeLabel":37,"stem":358,"options":359,"answer":174,"analysis":33},804470,"（2015年）某企业生产经营的产品品种繁多，间接成本比重较高，成本会计人员试图推动该企业采用作业成本法计算产品成本，下列理由中适合用于说服管理层的有（）。",[360,362,364,366],{"key":20,"text":361,"correct":22},"使用作业成本信息有利于价值链分析",{"key":24,"text":363,"correct":22},"通过作业管理可以提高成本控制水平",{"key":28,"text":365,"correct":22},"使用作业成本法可提高成本分配准确性",{"key":31,"text":367,"correct":22},"使用作业成本信息可以提高经营决策质量",{"id":369,"libraryId":5,"type":15,"typeLabel":16,"stem":370,"options":371,"answer":24,"analysis":33},804471,"（2017年）甲企业采用作业成本法计算产品成本，每批产品生产前需要进行机器调试。对调试中心进行成本分配时，最适合采用的作业成本动因是（）。",[372,374,376,378],{"key":20,"text":373,"correct":26},"产品品种",{"key":24,"text":375,"correct":22},"产品批次",{"key":28,"text":377,"correct":26},"产品数量",{"key":31,"text":379,"correct":26},"每批产品数量",{"id":381,"libraryId":5,"type":15,"typeLabel":16,"stem":382,"options":383,"answer":24,"analysis":33},804472,"（2016年）下列各项中，应使用强度动因作为作业量计量单位的是（）。",[384,386,388,390],{"key":20,"text":385,"correct":26},"产品的生产准备",{"key":24,"text":387,"correct":22},"产品的研究开发",{"key":28,"text":389,"correct":26},"产品的分批质检",{"key":31,"text":391,"correct":26},"产品的机器加工",{"id":393,"libraryId":5,"type":36,"typeLabel":37,"stem":394,"options":395,"answer":355,"analysis":33},804473,"（2011年）下列关于作业成本法与传统的成本计算方法（以产量为基础的完全成本计算方法）比较的说法中，正确的有（ ）。",[396,398,400,402],{"key":20,"text":397,"correct":26},"传统的成本计算方法对全部生产成本进行分配，作业成本法只对变动成本进行分配",{"key":24,"text":399,"correct":22},"传统的成本计算方法是按部门归集间接费用，作业成本法按作业归集间接费用",{"key":28,"text":401,"correct":26},"作业成本法的直接成本计算范围要比传统的成本计算方法的计算范围小",{"key":31,"text":403,"correct":22},"与传统的成本计算方法相比，作业成本法不便于实施责任会计和业绩评价",{"id":405,"libraryId":5,"type":36,"typeLabel":37,"stem":406,"options":407,"answer":355,"analysis":33},804475,"（2009年新）下列各项中，适合作为单位级作业的作业动因有（ ）。",[408,410,412,414],{"key":20,"text":409,"correct":26},"生产准备次数",{"key":24,"text":411,"correct":22},"零部件产量",{"key":28,"text":413,"correct":26},"采购次数",{"key":31,"text":415,"correct":22},"耗电千瓦时数",{"id":417,"libraryId":5,"type":36,"typeLabel":37,"stem":418,"options":419,"answer":98,"analysis":33},804476,"下列有关成本动因的说法中，不正确的有（）。",[420,422,424,426],{"key":20,"text":421,"correct":22},"成本动因是指产品成本的驱动因素",{"key":24,"text":423,"correct":22},"作业成本动因是引起作业成本增加的驱动因素",{"key":28,"text":425,"correct":22},"资源成本动因是产品成本增加的驱动因素",{"key":31,"text":427,"correct":26},"作业成本动因计量各成本对象耗用作业的情况，资源成本动因用来衡量一项作业的资源消耗量",{"id":429,"libraryId":5,"type":36,"typeLabel":37,"stem":430,"options":431,"answer":440,"analysis":33},804477,"下列关于作业成本法的说法，正确的有（）。",[432,434,436,438],{"key":20,"text":433,"correct":26},"作业成本法下对于间接成本的分配路径是“资源-部门-产品”",{"key":24,"text":435,"correct":22},"作业成本法是将间接成本和辅助费用更准确地分配到产品和服务的一种成本计算方法",{"key":28,"text":437,"correct":22},"作业成本法对于直接成本的处理方法，与传统成本计算方法相同",{"key":31,"text":439,"correct":26},"作业成本法将成本分配到成本对象采用追溯和动因分配形式","BC",{"id":442,"libraryId":5,"type":15,"typeLabel":16,"stem":443,"options":444,"answer":24,"analysis":33},804497,"某公司的主营业务是软件开发。该企业产品成本构成中，直接成本所占比重很小，而且与间接成本之间缺少明显的因果关系。该公司适宜采纳的成本核算方法是（ ）。",[445,447,449,451],{"key":20,"text":446,"correct":26},"传统成本计算法",{"key":24,"text":448,"correct":22},"作业成本计算法",{"key":28,"text":450,"correct":26},"标准成本计算法",{"key":31,"text":452,"correct":26},"变动成本计算法",{"id":454,"libraryId":5,"type":36,"typeLabel":37,"stem":455,"options":456,"answer":355,"analysis":33},804498,"下列各项中，适合作为单位级作业的作业动因有（ ）。",[457,458,459,460],{"key":20,"text":409,"correct":26},{"key":24,"text":411,"correct":22},{"key":28,"text":413,"correct":26},{"key":31,"text":415,"correct":22},{"id":462,"libraryId":5,"type":36,"typeLabel":37,"stem":463,"options":464,"answer":355,"analysis":33},804499,"下列关于作业成本法与传统的成本计算方法（以产量为基础的完全成本计算方法）比较的说法中，正确的有（ ）。",[465,466,468,469],{"key":20,"text":397,"correct":26},{"key":24,"text":467,"correct":22},"传统的成本计算方法按部门归集间接费用，作业成本法按作业归集间接费用",{"key":28,"text":401,"correct":26},{"key":31,"text":403,"correct":22},{"id":471,"libraryId":5,"type":15,"typeLabel":16,"stem":472,"options":473,"answer":28,"analysis":33},804505,"下列关于成本动因的说法，错误的是（ ）。",[474,476,478,480],{"key":20,"text":475,"correct":26},"资源成本动因是引起作业成本增加的驱动因素",{"key":24,"text":477,"correct":26},"作业成本动因被用来作为作业成本的分配基础",{"key":28,"text":479,"correct":22},"依据作业成本动因可以将资源成本分配给各有关作业",{"key":31,"text":481,"correct":26},"在作业成本法中，成本动因分为资源成本动因和作业成本动因",{"id":483,"libraryId":5,"type":15,"typeLabel":16,"stem":484,"options":485,"answer":31,"analysis":33},804506,"精确度最高、但其执行成本最昂贵的作业成本动因是（ ）。",[486,488,490,492],{"key":20,"text":487,"correct":26},"业务动因",{"key":24,"text":489,"correct":26},"持续动因",{"key":28,"text":491,"correct":26},"资源动因",{"key":31,"text":493,"correct":22},"强度动因",{"id":495,"libraryId":5,"type":15,"typeLabel":16,"stem":496,"options":497,"answer":20,"analysis":33},804507,"下列各项中，应使用强度动因作为作业量计量单位的是（ ）。",[498,500,502,504],{"key":20,"text":499,"correct":22},"新产品试制",{"key":24,"text":501,"correct":26},"检验",{"key":28,"text":503,"correct":26},"生产前机器调试",{"key":31,"text":391,"correct":26},{"id":506,"libraryId":5,"type":36,"typeLabel":37,"stem":507,"options":508,"answer":516,"analysis":33},804508,"下列关于成本动因的说法，正确的有（ ）。",[509,511,513,514],{"key":20,"text":510,"correct":22},"资源成本动因用来衡量一项作业的资源消耗量",{"key":24,"text":512,"correct":22},"作业成本动因计量各成本对象耗用作业的情况",{"key":28,"text":425,"correct":26},{"key":31,"text":515,"correct":22},"依据资源成本动因可以将资源成本分配给各有关作业","ABD",{"id":518,"libraryId":5,"type":36,"typeLabel":37,"stem":519,"options":520,"answer":98,"analysis":33},804509,"下列有关作业成本法下作业分配的表述，说法正确的有（ ）。",[521,523,525,527],{"key":20,"text":522,"correct":22},"作业成本分配时可以采用实际分配率或预算分配率",{"key":24,"text":524,"correct":22},"作业成本分配时如果采用预算分配率，发生的成本差异可以直接结转本期营业成本",{"key":28,"text":526,"correct":22},"作业成本分配时如果采用预算分配率，可以计算作业成本差异率并据以分配给有关产品",{"key":31,"text":528,"correct":26},"作业成本分配时如果采用预算分配率，发生的成本差异可以无需考虑",{"id":530,"libraryId":5,"type":36,"typeLabel":37,"stem":531,"options":532,"answer":48,"analysis":33},804510,"下列有关作业成本法优缺点的表述，错误的有（ ）。",[533,535,537,539],{"key":20,"text":534,"correct":26},"有助于改进成本控制",{"key":24,"text":536,"correct":26},"开发和维护费用较高",{"key":28,"text":538,"correct":22},"符合对外财务报告的需要",{"key":31,"text":540,"correct":22},"有利于管理控制",{"id":542,"libraryId":5,"type":36,"typeLabel":37,"stem":543,"options":544,"answer":553,"analysis":33},804511,"下列公司中适合采用作业成本法计算产品成本的有（ ）。",[545,547,549,551],{"key":20,"text":546,"correct":22},"公司的制造费用在产品成本中占有较大比重",{"key":24,"text":548,"correct":26},"公司的产品多样性程度低",{"key":28,"text":550,"correct":22},"公司面临的竞争激烈",{"key":31,"text":552,"correct":22},"公司的规模比较大","ACD",{"id":555,"libraryId":5,"type":15,"typeLabel":16,"stem":556,"options":557,"answer":24,"analysis":33},804512,"下列有关作业成本法的说法不正确的是（ ）。",[558,560,562,564],{"key":20,"text":559,"correct":26},"作业成本法的基本指导思想是“作业消耗资源、产品消耗作业”",{"key":24,"text":561,"correct":22},"作业成本法下间接成本的分配路径是“资源→部门→产品”",{"key":28,"text":563,"correct":26},"作业成本法认为任何一项产品的形成都要消耗一定的作业，执行任何一项作业都需要耗费资源",{"key":31,"text":565,"correct":26},"作业成本法下成本分配使用众多不同层次的成本动因",{"id":567,"libraryId":5,"type":15,"typeLabel":16,"stem":568,"options":569,"answer":24,"analysis":33},804513,"下列作业中属于品种级作业的是（ ）。",[570,572,574,576],{"key":20,"text":571,"correct":26},"机器加工、组装",{"key":24,"text":573,"correct":22},"产品更新",{"key":28,"text":575,"correct":26},"工厂保安",{"key":31,"text":503,"correct":26},{"id":578,"libraryId":5,"type":15,"typeLabel":16,"stem":579,"options":580,"answer":31,"analysis":33},804514,"下列四类作业成本库中，不依赖于产品的数量、批次和种类的成本库是（ ）。",[581,583,585,587],{"key":20,"text":582,"correct":26},"单位级作业成本库",{"key":24,"text":584,"correct":26},"批次级作业成本库",{"key":28,"text":586,"correct":26},"品种级作业成本库",{"key":31,"text":588,"correct":22},"生产维持级作业成本库",{"id":590,"libraryId":5,"type":15,"typeLabel":16,"stem":591,"options":592,"answer":28,"analysis":33},804515,"某车间只生产 A、B两种产品，本月车间搬运作业实际发生的成本为6300元，本月服务于A产品的搬运次数是50次，服务于B产品的搬运次数是70次，则本月A产品应分配的搬运作业成本为（ ）元。",[593,595,597,599],{"key":20,"text":594,"correct":26},"4300",{"key":24,"text":596,"correct":26},"3675",{"key":28,"text":598,"correct":22},"2625",{"key":31,"text":328,"correct":26},{"id":601,"libraryId":5,"type":15,"typeLabel":16,"stem":602,"options":603,"answer":20,"analysis":33},804516,"下列各项中属于增值作业与非增值作业的划分依据的是（ ）。",[604,606,608,610],{"key":20,"text":605,"correct":22},"是站在顾客的角度划分的",{"key":24,"text":607,"correct":26},"是站在股东的角度划分的",{"key":28,"text":609,"correct":26},"是站在债权人的角度划分的",{"key":31,"text":611,"correct":26},"是站在经营者的角度划分的",[613,616,619,622,625,628],{"id":614,"name":615,"category":7,"favorite":15},484,"中级会计-财务管理",{"id":617,"name":618,"category":7,"favorite":15},485,"中级会计-经济法",{"id":620,"name":621,"category":7,"favorite":15},486,"中级会计实务",{"id":623,"name":624,"category":7,"favorite":8},473,"初级管理会计师",{"id":626,"name":627,"category":7,"favorite":8},474,"专业知识综合卷",{"id":629,"name":630,"category":7,"favorite":8},475,"会计从业资格考试"]