[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-806430":3},{"question":4,"library":27},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":25,"analysis":26},806430,511,2,"多选题","下列关于企业价值评估与投资项目评价的异同的表述中，不正确的有（ ）。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","都可以给投资主体带来现金流量",false,{"key":16,"text":17,"correct":14},"B","现金流量都具有不确定性",{"key":19,"text":20,"correct":21},"C","寿命都是有限的",true,{"key":23,"text":24,"correct":21},"D","都具有稳定的或下降的现金流","CD","投资项目的寿命是有限的，而企业的寿命是无限的；典型的项目投资具有稳定的或下降的现金流，而企业通常将收益再投资并产生增长的现金流。",{"id":6,"name":28,"category":29,"favorite":30},"注册会计师-财务成本管理","会计财税",0]