[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-806341":3},{"question":4,"library":27},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":25,"analysis":26},806341,511,2,"多选题","甲部门是一个标准成本中心，下列成本差异中，属于甲部门责任的有（ ）。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","操作失误造成的材料数量差异",true,{"key":16,"text":17,"correct":14},"B","作业计划不当造成的人工效率差异",{"key":19,"text":20,"correct":21},"C","产品结构选择不合理导致的变动制造费用效率差异",false,{"key":23,"text":24,"correct":21},"D","由于采购材料质量缺陷导致工人多用工时造成的变动制造费用效率差异","AB","选项AB是在生产过程中造成的，因此属于标准成本中心的责任。标准成本中心不需要作出定价决策、产量决策、产品结构决策以及设备和技术决策，所以选项C不是答案。选项D是采购部门的责任。",{"id":6,"name":28,"category":29,"favorite":30},"注册会计师-财务成本管理","会计财税",0]