[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-805692":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},805692,511,1,"单选题","关于项目的资本成本的表述中，正确的是（）。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","项目所需资金来源于负债的风险高于来源于股票，项目要求的报酬率会更高",false,{"key":16,"text":17,"correct":14},"B","项目经营风险与企业现有资产平均风险相同，项目资本成本等于公司资本成本",{"key":19,"text":20,"correct":14},"C","项目资本结构与企业现有资本结构相同，项目资本成本等于公司资本成本",{"key":22,"text":23,"correct":24},"D","特定资本支出项目所要求的报酬率就是该项目的资本成本",true,"项目要求的报酬率取决于项目投资的风险，因此选项A的表述不正确；如果新的投资项目的风险与企业现有资产平均风险相同，则项目资本成本等于公司资本成本，选项B只说明了经营风险相同，选项C只说明了财务风险相同，因此都不正确。",{"id":6,"name":27,"category":28,"favorite":29},"注册会计师-财务成本管理","会计财税",0]