[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-804465":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},804465,511,1,"单选题","在确定直接人工正常标准成本时，标准工时不包括（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","设备意外故障产生的停工时间",true,{"key":16,"text":17,"correct":18},"B","必要的工间休息",false,{"key":20,"text":21,"correct":18},"C","每日例行设备调整时间",{"key":23,"text":24,"correct":18},"D","不可避免的废品所耗用的工时","标准工时是指在现有生产技术条件下，生产单位产品所需要的时间，包括直接加工操作必不可少的时间、必要的间歇和停工（如工间休息、设备调整准备时间）、不可避免的废品耗用工时等。不包括设备意外故障产生的停工时间。所以选项A不正确。",{"id":6,"name":27,"category":28,"favorite":29},"注册会计师-财务成本管理","会计财税",0]