[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-803267":3},{"question":4,"library":27},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":25,"analysis":26},803267,511,2,"多选题","（2016年）下列关于投资项目资本成本的说法中，正确的有（）。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","资本成本是投资项目的取舍率",true,{"key":16,"text":17,"correct":14},"B","资本成本是投资资本的必要报酬率",{"key":19,"text":20,"correct":21},"C","资本成本是投资项目的内含报酬率",false,{"key":23,"text":24,"correct":14},"D","资本成本是投资资本的机会成本","ABD","投资项目的资本成本是指项目本身所需投资资本的机会成本，是公司投资于资本支出项目所要求的报酬率，因此选项B、D为本题答案，选项C不是答案。采用内含报酬率法评价投资项目时，项目资本成本是投资项目的“取舍率”，如果内含报酬率高于资本成本，则项目具有财务可行性，因此选项A是答案。",{"id":6,"name":28,"category":29,"favorite":30},"注册会计师-财务成本管理","会计财税",0]