[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-803113":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},803113,511,1,"单选题","各月在产品数量变动较大的情况下，采用在产品按定额成本计算法将生产费用在完工产品和在产品之间进行分配时，可能导致（ ）。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","月初在产品成本为负数",false,{"key":16,"text":17,"correct":14},"B","本月发生的生产费用为负数",{"key":19,"text":20,"correct":21},"C","本月完工产品成本为负数",true,{"key":23,"text":24,"correct":14},"D","月末在产品成本为负数","采用在产品按定额成本计算法，本月完工产品成本=（月初在产品成本+本月发生的生产费用）-月末在产品成本，在各月在产品数量变动较大的情况下，月末在产品成本可能会大于月初在产品成本和本月发生的生产费用之和，所以可能导致本月完工产品成本为负数。",{"id":6,"name":27,"category":28,"favorite":29},"注册会计师-财务成本管理","会计财税",0]