[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-799366":3},{"question":4,"library":20},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":17,"analysis":19},799366,508,3,"判断题","房屋竣工价值仅指该竣工房屋在报告期内完成的价值（ ）。",[11,15],{"key":12,"text":13,"correct":14},"A","正确",false,{"key":16,"text":17,"correct":18},"B","错误",true,"房屋竣工价值不仅包括该竣工房屋在报告期内完成的价值，也包括跨年施工的房屋在本期以前完成的价值。",{"id":6,"name":21,"category":22,"favorite":23},"(中级) 统计工作实务","会计财税",0]