[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-798808":3},{"question":4,"library":29},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":27,"analysis":28},798808,508,2,"多选题","固定资产投资完成额包括()。",[11,15,18,21,24],{"key":12,"text":13,"correct":14},"A","建筑安装工程投资完成额",true,{"key":16,"text":17,"correct":14},"B","设备、工器具购置投资完成额",{"key":19,"text":20,"correct":14},"C","土地取得和前期工程费用",{"key":22,"text":23,"correct":14},"D","施工工作费用",{"key":25,"text":26,"correct":14},"E","建设单位其他费用","ABCDE","固定资产投资完成额是由建筑安装工程投资完成额，设备、工器具购置投资完成额和其他费用投资完成额三部分组成的。其中，固定资产投资中的其他费用是指除建筑安装工程投资、设备工器具购置和商品房购置以外的构成固定资产投资完成额的各种费用。包括：①土地取得费用；②前期工程费用；③施工工作费用；④建设单位其他费用。",{"id":6,"name":30,"category":31,"favorite":32},"(中级) 统计工作实务","会计财税",0]