[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-798760":3},{"question":4,"library":29},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":27,"analysis":28},798760,508,2,"多选题","房屋施工面积包括（ ）。",[11,15,18,21,24],{"key":12,"text":13,"correct":14},"A","本期新开工的房屋建筑面积",true,{"key":16,"text":17,"correct":14},"B","上期跨入本期继续施工的房屋建筑面积",{"key":19,"text":20,"correct":14},"C","上期停缓建在本期恢复施工的房屋建筑面积",{"key":22,"text":23,"correct":14},"D","本期竣工的房屋建筑面积",{"key":25,"text":26,"correct":14},"E","本期施工后又停缓建的房屋建筑面积。","ABCDE","指报告期内施工的全部房屋建筑面积。包括本期新开工的房屋建筑面积、上期跨入本期继续施工的房屋建筑面积、上期停缓建在本期恢复施工的房屋建筑面积、本期竣工的房屋建筑面积以及本期施工后又停缓建的房屋建筑面积。",{"id":6,"name":30,"category":31,"favorite":32},"(中级) 统计工作实务","会计财税",0]