[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-798427":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},798427,508,2,"多选题","R&D人员折合全时当量中的科学家和工程师的全时当量包括（）。",[11,15,18,21,24],{"key":12,"text":13,"correct":14},"A","参加R&D项目人员中的科学家的全时当量",true,{"key":16,"text":17,"correct":14},"B","参加R&D项目人员中的工程师的全时当量",{"key":19,"text":20,"correct":14},"C","应分摊在R&D项目上的管理人员中科学家和工程师的全时当量",{"key":22,"text":23,"correct":14},"D","应分摊在R&D项目上的直接服务人员中科学家和工程师的全时当量",{"key":25,"text":26,"correct":27},"E","参加R&D项目人员的折合当量",false,"ABCD","",{"id":6,"name":31,"category":32,"favorite":33},"(中级) 统计工作实务","会计财税",0]