[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-798080":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},798080,508,1,"单选题","在建筑安装工程构成中，材料费、人工费和机械使用费的比重约占到()以上。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","50%",false,{"key":16,"text":17,"correct":14},"B","60%",{"key":19,"text":20,"correct":14},"C","80%",{"key":22,"text":23,"correct":24},"D","90%",true,"在建筑安装工程构成中，材料费、人工费和机械使用费的比重约占到90%以上，其他各项费用所占比重较小，可以忽略不计。",{"id":6,"name":27,"category":28,"favorite":29},"(中级) 统计工作实务","会计财税",0]