[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-793918":3},{"question":4,"library":20},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":17,"analysis":19},793918,506,3,"判断题","房屋新开工面积包括上期跨人报告期继续施工的房屋面积。( )",[11,15],{"key":12,"text":13,"correct":14},"A","正确",false,{"key":16,"text":17,"correct":18},"B","错误",true,"房屋新开工面积指报告期内新开工建设的房屋建筑面积，以单位工程为核算对象，即整栋房屋的全部建筑面积，不能分割计算。不包括在上期开工跨入报告期继续施工的房屋建筑面积和上期停缓建而在本期恢复施工的房屋建筑面积。房屋的开工应以房屋正式开始破土刨槽（地基处理或打永久桩）的日期为准。",{"id":6,"name":21,"category":22,"favorite":23},"(初级) 统计工作实务","会计财税",0]