[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-793227":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},793227,506,2,"多选题","房屋施工面积指报告期内施工的全部房屋建筑面积，包括( )。",[11,15,18,21,25],{"key":12,"text":13,"correct":14},"A","本期新开工的面积",true,{"key":16,"text":17,"correct":14},"B","上年开工跨人本期继续施工的房屋面积",{"key":19,"text":20,"correct":14},"C","上期已停建在本期恢复施工的房屋面积",{"key":22,"text":23,"correct":24},"D","本期未竣工面积",false,{"key":26,"text":27,"correct":14},"E","本期施工后又停建缓建的房屋面积","ABCE","房屋施工面积：指报告期内施工的全部房屋建筑面积。包括本期新开工的房屋建筑面积、上期跨入本期继续施工的房屋建筑面积、上期停缓建在本期恢复施工的房屋建筑面积、本期竣工的房屋建筑面积以及本期施工后又停缓建的房屋建筑面积。多层建筑应填各层建筑面积之和。",{"id":6,"name":31,"category":32,"favorite":33},"(初级) 统计工作实务","会计财税",0]