[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-793127":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},793127,506,2,"多选题","本年施工规模包括（）。",[11,15,18,21,24],{"key":12,"text":13,"correct":14},"A","报告期以前已开工跨人本年继续施工的单项工程的设计能力",true,{"key":16,"text":17,"correct":14},"B","报告期新开工工程的设计能力",{"key":19,"text":20,"correct":14},"C","报告期内建成投产的单项工程设计能力",{"key":22,"text":23,"correct":14},"D","报告期施工后又停缓建的单项工程设计能力",{"key":25,"text":26,"correct":27},"E","报告期以前开工并已投产的工程",false,"ABCD","",{"id":6,"name":31,"category":32,"favorite":33},"(初级) 统计工作实务","会计财税",0]