[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-793101":3},{"question":4,"library":29},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":27,"analysis":28},793101,506,2,"多选题","投资完成额的构成包括（）。",[11,15,18,21,24],{"key":12,"text":13,"correct":14},"A","建筑工程",true,{"key":16,"text":17,"correct":14},"B","安装工程",{"key":19,"text":20,"correct":14},"C","设备、工具、器具购置",{"key":22,"text":23,"correct":14},"D","在固定资产建造过程中发生的其他费用",{"key":25,"text":26,"correct":14},"E","在固定资产购置过程中发生的其他费用","ABCDE","",{"id":6,"name":30,"category":31,"favorite":32},"(初级) 统计工作实务","会计财税",0]