[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-793067":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},793067,506,2,"多选题","实际工作中计算建筑安装工程投资额的方法有（ ）。",[11,15,18,22,25],{"key":12,"text":13,"correct":14},"A","单价法",true,{"key":16,"text":17,"correct":14},"B","部位进度法",{"key":19,"text":20,"correct":21},"C","预算法",false,{"key":23,"text":24,"correct":21},"D","支出法",{"key":26,"text":27,"correct":21},"E","收入法","AB","",{"id":6,"name":31,"category":32,"favorite":33},"(初级) 统计工作实务","会计财税",0]