[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-792722":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},792722,506,1,"单选题","建筑安装工程投资额的计算方法一般是（）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","计划工作量乘以实际单价",false,{"key":16,"text":17,"correct":18},"B","已经完成的实物工作量乘以预算单价",true,{"key":20,"text":21,"correct":14},"C","计划工作量乘以预算单价",{"key":23,"text":24,"correct":14},"D","已经完成的实物工作量乘以实际单价","",{"id":6,"name":27,"category":28,"favorite":29},"(初级) 统计工作实务","会计财税",0]