[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-777907":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},777907,498,2,"多选题","预算现金流量表中的相关数据的编制需要：",[11,15,18,21,24],{"key":12,"text":13,"correct":14},"A","销售预算",true,{"key":16,"text":17,"correct":14},"B","直接材料预算",{"key":19,"text":20,"correct":14},"C","直接人工预算",{"key":22,"text":23,"correct":14},"D","销售及管理费用预算",{"key":25,"text":26,"correct":27},"E","生产预算",false,"ABCD","生产预算是预算生产量，不涉及金额，因此不涉及现金流量表。",{"id":6,"name":31,"category":32,"favorite":33},"(中级) 审计专业相关知识","会计财税",0]