[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-775422":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},775422,498,1,"单选题","在上期成本费用水平的基础上，结合预算期业务量水平和成本费用相关因素可能的变动，通过调整原有费用项目金额编制预算的方法是（ ）。[2009年中级真题]",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","滚动预算法",false,{"key":16,"text":17,"correct":18},"B","增量预算法",true,{"key":20,"text":21,"correct":14},"C","固定预算法",{"key":23,"text":24,"correct":14},"D","弹性预算法","A项，滚动预算法也称连续预算法，指预算期脱离会计年度，随着执行逐期向后滚动，预算期保持不变的一种预算编制方法；B项，增量预算法是以基期成本费用水平为基础，结合预算期业务量水平及有关影响因素的变动情况，通过调整有关费用项目编制预算的一种方法；C项，固定预算法是按照预算期内可能实现的经营活动水平确定相应的固定预算数来编制预算的方法；D项，弹性预算法又称变动预算法、滑动预算法，是在变动成本法的基础上，以未来不同业务水平为基础编制预算的方法，是固定预算的对称。",{"id":6,"name":27,"category":28,"favorite":29},"(中级) 审计专业相关知识","会计财税",0]