[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-773873":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},773873,498,2,"多选题","下列属于更新设备决策中，初始现金流量考虑的范围是（ ）",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","原设备的购买价款",false,{"key":16,"text":17,"correct":18},"B","旧设备残值出售收入",true,{"key":20,"text":21,"correct":18},"C","追加的流动资金",{"key":23,"text":24,"correct":18},"D","新设备的购买价格",{"key":26,"text":27,"correct":14},"E","原设备的折旧","BCD","考察项目投资决策 更新改造设备的现金流包括，新设备的购买价款、新设备投资追加的流动资金、原设备残值变现收支。",{"id":6,"name":31,"category":32,"favorite":33},"(中级) 审计专业相关知识","会计财税",0]