[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-773868":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},773868,498,2,"多选题","判断项目可行性的标准是（ ）",[11,15,18,21,25],{"key":12,"text":13,"correct":14},"A","项目回收净现值小于零",false,{"key":16,"text":17,"correct":14},"B","项目到期收回的资金大于项目投入资金",{"key":19,"text":20,"correct":14},"C","项目预期收益率大于无风险报酬率",{"key":22,"text":23,"correct":24},"D","项目预期收益率大于必要报酬率",true,{"key":26,"text":27,"correct":24},"E","项目回收净现值大于零","DE","考察项目投资决策 当项目预期收益率超过项目的必要报酬率，即项目资本成本时，项目可行。 选项B未考虑时间价值； 选项C项目投资风险包括无风险报酬率和风险溢价，项目预期收益率仅大于无风险报酬率是不可行的。",{"id":6,"name":31,"category":32,"favorite":33},"(中级) 审计专业相关知识","会计财税",0]