[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-773238":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},773238,497,1,"单选题","审查材料采购成本构成时，应检查其构成项目是否正确，以下项目中应计入材料采购成本的是（）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","入库前整理费用",true,{"key":16,"text":17,"correct":18},"B","材料保管费用",false,{"key":20,"text":21,"correct":18},"C","招待费",{"key":23,"text":24,"correct":18},"D","加班费","材料的采购成本，包括购买价款、相关税费、运输费、装卸费、保险费及其他可归属于存货采购成本的费用等。从国外进口的材料，其发生的进口环节的各种价内税金也应列入材料采购成本。B项应计入制造费用，结转进入生产成本；CD两项应计入管理费用。",{"id":6,"name":27,"category":28,"favorite":29},"(中级) 审计理论与实务","会计财税",0]