[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-771978":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},771978,496,1,"单选题","企业按照合同或供应销售计划所规定的最后期限，合理组织每个工艺、工序的生产及其所需物料和设备的到达时间，使每个工序都在开始加工时得到所需要的加工对象，并在下道工序的计划开工时间将在本工序加工完毕的对象输送到下道工序，这种系统叫做：",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","适时制",true,{"key":16,"text":17,"correct":18},"B","物料需求计划",false,{"key":20,"text":21,"correct":18},"C","采购研究",{"key":23,"text":24,"correct":18},"D","配送系统","适时制是企业按照合同或供应销售计划所规定的最后期限，合理组织每个工艺、工序的生产及其所需物料和设备的到达时间，使每个工序都在开始加工时得到所需要的加工对象，并在下道工序的计划开工时间将在本工序加工完毕的对象输送到下道工序，尽可能实现“零库存”。",{"id":6,"name":27,"category":28,"favorite":29},"国际注册内部审计师","会计财税",0]