[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-769638":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},769638,496,1,"单选题","下列哪项是首席审计执行官将任务分配给审计人员的最佳方式？",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","审计项目的负责人必须具备较强的项目管理能力",false,{"key":16,"text":17,"correct":18},"B","对审计预期结果精确估计。与审计人员讨论可能的方法，并就采纳的方法达成一致意见",true,{"key":20,"text":21,"correct":14},"C","在控制薄弱的环节安排具有适当经验的审计人员，确保审计项目在规定时间内完成",{"key":23,"text":24,"correct":14},"D","让审计人员自己形成审计预期结果和方法","首席审计执行官应对审计业务的实施加以适当的督导。对审计预期结果精确估计，与审计人员讨论可能的方法，并就采纳的方法达成一致意见，这些都属于督导的内容。",{"id":6,"name":27,"category":28,"favorite":29},"国际注册内部审计师","会计财税",0]