[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-769012":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},769012,496,1,"单选题","某工厂采用计算机采购循环系统控制订货量，当计算机提示存货水平过低时，采购部门就会进行订货，但是经常出现采购量超过需求量的现象。关于这一做法中存在的风险，下列说法中不正确的是：",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","该风险是因为存货水平低与需求量并没有直接的关系导致的",false,{"key":16,"text":17,"correct":14},"B","可以通过增加部门主管审核请购单后再转交给采购部门的办法来控制风险",{"key":19,"text":20,"correct":21},"C","这一做法基本上不影响生产进程，偶尔的采购量超过需求量也没有关系",true,{"key":23,"text":24,"correct":14},"D","内部审计师在审计时提出验收部门在收到原始采购订单之后才对验收部门进行卸货的方法被拒绝采纳","采购量超过需求量作为该环节的风险应该予以关注并改进，不能放任不管，否则会造成浪费资源、库存积压等问题。",{"id":6,"name":27,"category":28,"favorite":29},"国际注册内部审计师","会计财税",0]