[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-766038":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},766038,495,2,"多选题","采用静态回收期法对投资项目进行决策存在的主要缺陷有：",[11,15,18,22,25],{"key":12,"text":13,"correct":14},"A","计算方法比较繁琐",false,{"key":16,"text":17,"correct":14},"B","方法原理不易理解",{"key":19,"text":20,"correct":21},"C","不能反映项目的回报状况",true,{"key":23,"text":24,"correct":21},"D","没有考虑回收期后的现金流量",{"key":26,"text":27,"correct":21},"E","没有考虑货币时间价值的影响","CDE","投资回收期法缺陷是各年度的现金流被同等看待，忽略货币时间价值；且不考虑回收期后的现金流量状况；也无法反映项目的回报状况；另外，目标投资回收期是凭经验确定，缺乏客观性。",{"id":6,"name":31,"category":32,"favorite":33},"(初级) 审计专业相关知识","会计财税",0]