[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-765994":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},765994,495,1,"单选题","不受现有费用项目和开支水平限制，并能够克服增量预算方法缺点的预算方法是（ ）。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","弹性预算方法",false,{"key":16,"text":17,"correct":14},"B","固定预算方法",{"key":19,"text":20,"correct":21},"C","零基预算方法",true,{"key":23,"text":24,"correct":14},"D","滚动预算方法","零基预算不受前期成本费用项目和水平限制。",{"id":6,"name":27,"category":28,"favorite":29},"(初级) 审计专业相关知识","会计财税",0]