[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-762560":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},762560,494,2,"多选题","下列有关材料采购内部控制的表述，存在内部控制设计缺陷的有：",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","请购单既可由仓库人员填制，也可由车间、管理部门人员填制",false,{"key":16,"text":17,"correct":18},"B","订购单未连续编号",true,{"key":20,"text":21,"correct":18},"C","验收人员出差期间，验收业务由采购人员代为执行",{"key":23,"text":24,"correct":18},"D","财会人员收到采购发票后，直接根据发票记录的单价和数量登记相关账簿",{"key":26,"text":27,"correct":18},"E","收到采购发票前，将材料在仓库临时存放，暂不办理验收手续","BCDE","订购单应连续编号，选项B不正确；采购与验收应相互独立，选项C不正确；财会人员收到采购发票后，应根据发票记录和验收单、请购单等登记账簿，选项D的说法不正确。材料购进时，应及时办理入库，选项E说法不正确。",{"id":6,"name":31,"category":32,"favorite":33},"(初级) 审计理论与实务","会计财税",0]