[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-762151":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},762151,494,1,"单选题","采购与付款循环中属于采购交易的“完整性”认定的关键内部控制是（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","验收单均经事先连续编号并以登记入账",true,{"key":16,"text":17,"correct":18},"B","采购经适当级别批准",false,{"key":20,"text":21,"correct":18},"C","采购的价格和折扣均经适当批准",{"key":23,"text":24,"correct":18},"D","注销凭证以防止重复使用","A属于采购交易的“完整性”认定的关键内部控制；B授权批准与“发生”认定相关；C属于采购交易的“准确性”认定的关键内部控制 ；新版章节练习，考前压卷，金考典软件考前更新，下载链接 www.jinkaodian.com D重复使用就是重复入账与采购交易的“发生”认定相关。",{"id":6,"name":27,"category":28,"favorite":29},"(初级) 审计理论与实务","会计财税",0]