[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-753046":3},{"question":4,"library":27},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":25,"analysis":26},753046,486,2,"多选题","下列项目中，影响固定资产入账价值的有（ ）。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","购买设备发生的运杂费",true,{"key":16,"text":17,"correct":14},"B","取得固定资产而交纳的契税、耕地占用税",{"key":19,"text":20,"correct":21},"C","固定资产达到预定可使用状态后发生的专门借款利息费用",false,{"key":23,"text":24,"correct":14},"D","施工过程中盘亏工程物资的净损失","ABD","选项C，计入财务费用；选项D，冲减在建工程成本，影响固定资产的入账价值。当工程物资发生盘盈、盘亏、报废、毁损，若工程项目尚未完工的，计入或冲减所建工程项目的成本；工程已经完工的，计入当期营业外收支。",{"id":6,"name":28,"category":29,"favorite":30},"中级会计实务","会计财税",1]