[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-752808":3},{"question":4,"library":27},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":25,"analysis":26},752808,486,2,"多选题","下列关于成本与可变现净值孰低法的表述中，正确的有（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","成本指的是期末存货的实际成本，如果企业采用计划成本法核算的，则应调整为实际成本",true,{"key":16,"text":17,"correct":18},"B","可变现净值等于期末存货的估计售价",false,{"key":20,"text":21,"correct":14},"C","企业预计的销售存货的现金流入，并不等于存货的可变现净值",{"key":23,"text":24,"correct":18},"D","当存货成本高于其可变现净值时，存货应按成本计量","AC","选项A，在资产负债表上，计入存货项目的金额，应该是存货的实际成本，因此在期末应当将计划成本法调整为实际成本法；选项B，存货的可变现净值等于存货的估计售价减去至完工时估计将要发生的成本、估计的销售费用以及相关税费后的金额；选项C，企业预计的销售存货的现金流入减去至完工估计将要发生的成本、估计销售费用以及相关税费后的金额是存货的可变现净值，因此二者不相等；选项D，当存货成本高于其可变现净值时，表明发生减值，存货应计提跌价准备，计提减值准备后存货的账面价值是按可变现净值计量，而不是按成本计量。",{"id":6,"name":28,"category":29,"favorite":30},"中级会计实务","会计财税",1]