[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-749650":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},749650,485,1,"单选题","（2011年）2009年 8月 5日，经发包人甲公司同意，总承包人乙公司将自己承包的部分建设工程分包给丙公司。因丙公司完成的工程质量出现问题，给甲公司造成 100万元的经济损失。根据合同法律制度的规定，下列关于对甲公司损失承担责任的表述中，正确的是（ ）。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","由乙公司承担赔偿责任",false,{"key":16,"text":17,"correct":14},"B","由丙公司承担赔偿责任",{"key":19,"text":20,"correct":14},"C","先由丙公司承担赔偿责任，不足部分由乙公司承担",{"key":22,"text":23,"correct":24},"D","由乙公司和丙公司承担连带赔偿责任",true,"",{"id":6,"name":27,"category":28,"favorite":7},"中级会计-经济法","会计财税"]