[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-748573":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},748573,484,1,"单选题","某公司全年（360天）材料采购量预计为7200吨，假定材料日耗均衡，从订货到送达正常需要3天，鉴于延迟交货会产生较大损失，公司按照延误天数2天建立保险储备。不考虑其他因素，材料再订货点为（ ）吨。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","40",false,{"key":16,"text":17,"correct":14},"B","80",{"key":19,"text":20,"correct":14},"C","60",{"key":22,"text":23,"correct":24},"D","100",true,"日耗用量＝7200\u002F360＝20（吨），保险储备量＝20×2＝40（吨），再订货点＝20×3＋40＝100（吨）。",{"id":6,"name":27,"category":28,"favorite":7},"中级会计-财务管理","会计财税"]