[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-748081":3},{"question":4,"library":20},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":13,"analysis":19},748081,484,3,"判断题","如果项目的全部投资均于建设起点一次投入，且建设期为零，运营期每年现金净流量相等，则计算内含报酬率所使用的年金现值系数等于该项目静态投资回收期期数。（ ）",[11,15],{"key":12,"text":13,"correct":14},"A","正确",true,{"key":16,"text":17,"correct":18},"B","错误",false,"项目的全部投资均于建设起点一次投入，且建设期为零，第 1至第 n期每期期末现金净流量为普通年金的形式，则计算内含报酬率所使用的年金现值系数等于该项目静态回收期期数。",{"id":6,"name":21,"category":22,"favorite":23},"中级会计-财务管理","会计财税",1]