[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-748005":3},{"question":4,"library":20},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":17,"analysis":19},748005,484,3,"判断题","（2012年）如果项目的全部投资均于建设起点一次投入，且建设期为零，运营期每年现金净流量相等，则计算内含收益率所使用的年金现值系数等于该项目投资回收期期数。（ ）",[11,15],{"key":12,"text":13,"correct":14},"A","正确",false,{"key":16,"text":17,"correct":18},"B","错误",true,"项目的全部投资均于建设起点一次投入，建设期为零，第 1 至第 n 期每期现金净流量取得了普通年金的形式，则计算内含收益率所使用的年金现值系数等于该项目静态投资回收期期数但不等于动态回收期期数，动态回收期期数需要使用年金现值系数，利用内插法推算出回收期。",{"id":6,"name":21,"category":22,"favorite":23},"中级会计-财务管理","会计财税",1]