[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-747694":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},747694,484,1,"单选题","企业按弹性预算法编制费用预算，直接人工工时为10万小时时，变动成本为60万元，固定成本为30万元，总成本费用为90万元；如果直接人工工时达到12万小时，则总成本费用为（ ）万元。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","96",false,{"key":16,"text":17,"correct":14},"B","108",{"key":19,"text":20,"correct":21},"C","102",true,{"key":23,"text":24,"correct":14},"D","90","由公式法Y＝a＋bx，可知90＝30＋b×10，得b＝6，即Y＝30＋6x，将直接人工工时12万代入公式，得总成本费用＝30＋6×12＝102（万元）。",{"id":6,"name":27,"category":28,"favorite":7},"中级会计-财务管理","会计财税"]