[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-747657":3},{"question":4,"library":20},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":13,"analysis":19},747657,484,3,"判断题","采用弹性预算法编制成本费用预算时，业务量计量单位的选择非常关键，自动化生产车间适合用机器工时作为业务量的计量单位。（ ）",[11,15],{"key":12,"text":13,"correct":14},"A","正确",true,{"key":16,"text":17,"correct":18},"B","错误",false,"编制弹性预算，要选用一个最能代表生产经营活动水平的业务量计量单位。自动化生产车间以机器工时作为业务量的计量单位是较为合理的。",{"id":6,"name":21,"category":22,"favorite":23},"中级会计-财务管理","会计财税",1]