[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-733388":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},733388,477,1,"单选题","固定资产管理模块的初始化工作，应不包括()。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","设置控制参数",false,{"key":16,"text":17,"correct":18},"B","增加固定资产卡片",true,{"key":20,"text":21,"correct":14},"C","设置基础信息",{"key":23,"text":24,"correct":14},"D","录入原始卡片","固定资产管理模块的初始化工作主要包括设置控制参数、设置基础信息、录入原始卡片。",{"id":6,"name":27,"category":28,"favorite":29},"会计电算化","会计财税",0]