[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-733100":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},733100,477,1,"单选题","关于固定资产管理模块的启用期间，以下说法错误的是()。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","可以与系统中建立该账套的期间相同",false,{"key":16,"text":17,"correct":18},"B","可以早于系统中建立该账套的期间",true,{"key":20,"text":21,"correct":14},"C","可以晚于系统中建立该账套的期间",{"key":23,"text":24,"correct":14},"D","以上都对","固定资产模块的启用会计‘期间，不得早于系统中建立该账套的期间。",{"id":6,"name":27,"category":28,"favorite":29},"会计电算化","会计财税",0]