[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-730628":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},730628,476,1,"单选题","甲、乙均为国有企业，甲向乙购买一批货物，约定采用托收承付验货付款结算方式。2008年3月1日，乙办理完发货手续，发出货物；3月2日，乙到开户行办理托收手续；3月10日，铁路部门向甲发出提货通知；3月14日，甲向开户行表示承付，通知银行付款。则承付期的起算时间是()。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","3月2日",false,{"key":16,"text":17,"correct":14},"B","3月3日",{"key":19,"text":20,"correct":21},"C","3月11日",true,{"key":23,"text":24,"correct":14},"D","3月15日","验货付款的承付期为10天，从运输部门向付款人发出提货通知的次日算起，收付双方在合同中明确规定，并在托收凭证上注明验货付款期限的，银行从其规定。",{"id":6,"name":27,"category":28,"favorite":29},"财经法规与会计职业道德","会计财税",0]